Getting ready for the motor…

Productive day in the engine bay.

From this:
Click the image to open in full size.

To this:
Click the image to open in full size.

Installed tons of hole plugs.
Routed front body harness (both sides).
Wired headlights, re-routed cables.
Installed A-panel and bonnet plastic alignment brackets.
Installed DSC / Brake booster / Master Cylinder / Brake lines, connected brake pedal.
Installed complete wiper assembly.
Installed all firewall trim and brackets.
Installed extra heat shielding in tunnel.
Installed PS pump bracket.
Installed motor mount.
Installed fusebox.

I really like the way the underside of the bonnet is looking. Spent some time routing the wiring to make it as hidden as possible. Not running washers. Really clean.
Click the image to open in full size.

Here’s the extra Design Engineering heat shielding I added to the tunnel. Because that area gets pretty darn hot. The coating on the header should hopefully keep things cooler up front, but the cat will be pretty much right under the shifter, at the front of the mid-pipe. Hopefully this will help. I’ll be installing the OEM heat shield over this, might need to bend it a bit for fitment.
Click the image to open in full size.
Click the image to open in full size.

Getting close to being ready to hang the motor… finish line is in sight, finally!
Still lots to do before it’s done, but it’s starting to feel real now!